Jose Luis Soria

My feedback

  1. 165 votes
    Vote
    Sign in
    Check!
    (thinking…)
    Reset
    or sign in with
    • facebook
    • google
      Password icon
      Signed in as (Sign out)
      You have left! (?) (thinking…)
      21 comments  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
      Jose Luis Soria commented  · 

      I know that it's not an event. That's why I'm proposing to promote it to an event.
      Planning is an activity. It takes place at the Sprint Planning meeting event.
      Collaborating about what was done during the Sprint is an activity. It takes place at the Sprint Review meeting event.
      Inspecting and adapting are activities. They are done at the Sprint Retrospective event.
      Synchronizing is an activity that takes place in the Daily Scrum.
      Refining the backlog is an activity, let's create an event for it. I’m not even saying that it must be a time box or that it has to take place always at the same time. I mean that we should list it along the other events so it gets the same attention.

      Jose Luis Soria shared this idea  · 
    • 9 votes
      Vote
      Sign in
      Check!
      (thinking…)
      Reset
      or sign in with
      • facebook
      • google
        Password icon
        Signed in as (Sign out)
        You have left! (?) (thinking…)
        2 comments  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
        Jose Luis Soria shared this idea  · 
      • 61 votes
        Vote
        Sign in
        Check!
        (thinking…)
        Reset
        or sign in with
        • facebook
        • google
          Password icon
          Signed in as (Sign out)
          You have left! (?) (thinking…)
          5 comments  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
          Jose Luis Soria shared this idea  · 

        Feedback and Knowledge Base