Pierre Mengal

My feedback

  1. 3 votes
    Vote
    Sign in
    Check!
    (thinking…)
    Reset
    or sign in with
    • facebook
    • google
      Password icon
      Signed in as (Sign out)
      You have left! (?) (thinking…)
      2 comments  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
      Pierre Mengal commented  · 

      Mark, this is because they are static flow diagrams. It's obvious that the Spring Backlog content is being processed by the Sprint. So see those as inputs in the sprint (which is the circular drawing).

      I'm sure that you will prefer this one: https://labs.openviewpartners.com/wp-content/uploads/files/2013/05/Scrum-Sprint_sized.jpg

    • 83 votes
      Vote
      Sign in
      Check!
      (thinking…)
      Reset
      or sign in with
      • facebook
      • google
        Password icon
        Signed in as (Sign out)
        You have left! (?) (thinking…)
        7 comments  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
      • 76 votes
        Vote
        Sign in
        Check!
        (thinking…)
        Reset
        or sign in with
        • facebook
        • google
          Password icon
          Signed in as (Sign out)
          You have left! (?) (thinking…)
          7 comments  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
          Pierre Mengal supported this idea  · 
        • 3 votes
          Vote
          Sign in
          Check!
          (thinking…)
          Reset
          or sign in with
          • facebook
          • google
            Password icon
            Signed in as (Sign out)
            You have left! (?) (thinking…)
            2 comments  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
            Pierre Mengal commented  · 

            I think you missed the point about what a PO is.

          • 12 votes
            Vote
            Sign in
            Check!
            (thinking…)
            Reset
            or sign in with
            • facebook
            • google
              Password icon
              Signed in as (Sign out)
              You have left! (?) (thinking…)
              1 comment  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
              Pierre Mengal commented  · 

              Excellent point. This would also reduce the ambiguity around the concept of Scrum Goal that is very often overlooked in many of the Scrum implementation I audited.

              Pierre Mengal supported this idea  · 
            • 1 vote
              Vote
              Sign in
              Check!
              (thinking…)
              Reset
              or sign in with
              • facebook
              • google
                Password icon
                Signed in as (Sign out)
                You have left! (?) (thinking…)
                1 comment  ·  General  ·  Flag idea as inappropriate…  ·  Admin →
                Pierre Mengal commented  · 

                If what they have to say is related to the spring goal and add value to the meeting, why not. If not related the activities that emerges from the sprint backlog, this may add unnecessary complexity in the meeting.

              Feedback and Knowledge Base